Wanlong team overnight assembly and delivery of traction substation unit – Suzhou to Jinan

Shandong Quancheng Green Modern Trolleybus Transit Demonstration Project

$28,000.00
促销价  $28,000.00 常规价格 
跳至产品信息
Wanlong team overnight assembly and delivery of traction substation unit – Suzhou to Jinan

Shandong Quancheng Green Modern Trolleybus Transit Demonstration Project

$28,000.00
促销价  $28,000.00 常规价格 
已含税费。 结账时计算运费。
This is a custom-made product. Please contact us to discuss your specifications and receive a quotation.
CONTACT US FOR CUSTOM QUOTE
Description

Project Overview

Since the official launch of the Shandong Quancheng Green Modern Trolleybus Transit Demonstration Project, Suzhou Wanlong Electric Group Co., Ltd. has mobilized a full strategic deployment in response to the project's large scale and tight timeline. A dedicated project team was established, led directly by the company's senior management, with the Smart Application Engineering Service Center as the core execution department.

Wanlong Electric compact DC traction substation delivery – Shandong Quancheng trolleybus project

Cross-Department Collaboration

The project team was structured across three functional layers:

  • "Forward" — Intelligent Complete Equipment Division: Responsible for thoroughly understanding customer requirements, surveying installation site conditions, and completing the full solution design with precision.
  • "Midfield" — Complete Equipment Workshop, Electrical Workshop, Measurement & Control Protection Device Division, Procurement Department, and Finance Center: Responsible for front-end material procurement, production, and installation integration to lay a solid foundation for project delivery.
  • "Defense" — System Engineering Service Department, Remote O&M Platform Division, and Quality Department: Responsible for factory quality inspection and on-site commissioning services.

Through coordinated cross-departmental collaboration, the team effectively ensured compliance with substation equipment inspection and acceptance standards, driving project delivery in a solid, efficient, and orderly manner.

First Substation Delivery

On the 23rd of this month, under the full cross-departmental collaboration of the Smart Application Engineering Service Center, the company successfully completed the delivery of the first compact substation unit for this project.

To ensure smooth project delivery, the Complete Equipment Workshop and Electrical Workshop, together with the System Engineering Service Department, demonstrated Wanlong's core belief of "crafting with care, delivering with commitment." Undeterred by the cold winter nights, the team worked overtime through the night — meticulously installing every component, leaving no detail unchecked, and maintaining their posts until the early hours of the following morning. The completed unit was then transported overnight from Suzhou to Jinan, successfully completing the first substation delivery.

This achievement earned recognition from the client and laid a solid foundation for the continued advancement of the project.

Looking Ahead

The successful delivery of the first compact substation marks the first milestone of this project and a strong start to our delivery commitments. Suzhou Wanlong Electric Group Co., Ltd. will continue to uphold its responsibilities at every level — steadily, methodically, and with unwavering dedication — to ensure each subsequent delivery reaches an even higher standard.

Care

To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.

Design

Our dedication to excellence extends beyond materials; it encompasses the artistry and craftsmanship illustrated in every piece we create.